Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-10-04 09:33
106
Company Profile
By certification [File Integrity]
Contact: highlingdredger(Ms.)
Email:
Telephone:
Area: Beijing
Address: No. 01599, Xiangjiang West Street, Advanced Manufactur Industrial Park, Binhai Economy Development Zone, Weifang, Shandong, China (261108)
| HL200 | |
| Dredger LOA | 20.0m |
| Hull size | (L) 13.0 x (B) 5.2 x (H)1.5m |
| Main pontoon | (L) 8.3 (B) x 2.2 x (H)1.5m |
| Side pontoon | (L) 11.0 x (B) 1.5 x (H) 1.5m |
| Structure | Can be dismantled and re-assembled easily, box structure, lower delivery cost |
| Main engine brand/power | Cummins/224kW |
| Auxiliary engine brand/power | |
| Harbour generator | Cummins/20kW |
| Total power | 224kW |
| Dredging pump | Warman technology |
| Discharge pipe innerdiameter | 200mm |
| Head | 30m |
| Max. dredging depth | 8m |
| Water flow | 800m3/H |
| Solid sand capacity | 160m3/H |
| Discharge distance | 800m |
| Cutter head diameter | 1300mm |
| Cutter power | 30kW |
| Draught | 1.1m |
| Displacement | 65T |
| Hydraulic control system | PLC Siemens |
| Wire rope pulling force (lifting winch )*quantity | 40kN *1 |
| Wire rope pulling force (traversing winch )*quantity | 40kN *2 |
| Operation room | Adjustable chair, movable side-window, air condition, PLC system, signal lights and floodlights |
| Total weight | 50T |
| Total fuel oil consumption | 34L/H |